Backed with the team of our highly professional pest experts, we have been engaged in providing unmatched pre construction termite control services to our clients for more than 15 years. We use best quality chemicals & termite proof materials in our treatment. Our offered anti termite treatment helps many builders in making their buildings, residential & commercial projects termite free at pre-construction stage.
The principal of the treatment is to create a chemical barrier below and around the building so as to deny entry to the termites into the buildings.
The treatment will commence after the foundation and the plinth wall construction is completed.
After the soil filling is completed in the plinth area and before the dry rubble packing, the entire surface of the filled soil and the top surface of plinth wall/beam shall be treated with the chemical emulsion at 5 litre per sq.m.
Rodding shall be carried out along the junction of wall and soil filling at 1 mtr. Intervals down up to 30 cm. emulsion shall be sprayed along the wall junction at 1 litre pre linear metre so that it mixes thoroughly with the broken-up soil. The disturbed earth is then tamped back in place.
The soil around the external perimeter of the building up to a depth of 30 cm shall be treated at 2.25 litres per linear meter of the plinth wall.
When pipes, wastes and conduits enter the soil inside the area of the foundation, the soil surrounding the point of entry must be loosened around each such pipe, waste or conduit for a distance of 15 cm and upto a depth of 7.5cm and loosened soil shall be treated with chemical emulsion.
The treatment starts when the excavation is complete and before lying soiling and pcc.
After the soil filling is completed in the plinth area and before the dry rubble packing, the entire surface of the filled soil and the top surface of plinth wall/beam shall be treated with the chemical emulsion at 5 litre per sq.m.
The soil coming in contact with the retaining wall shall be treated at 5 litre per sq.m. the treatment shall follow the backfilling is done in stages of 30 cms but not exceed a depth of 1 meter.
The soil around the external perimeter of the building up to a depth of 30 cm shall be treated at 2.25 litre per linear meter.
When pipes, wastes and conduits enter the soil inside the area of the foundation, the soil surrounding the point of entry must be loosened around each such pipe, waste or conduit for a distance of 15 cm and upto a depth of 7.5 cm and loosened soil shall be treated with chemical emulsion.
We ensure a 100% pest free environment.
The Treatment is done by drilling at wall & floor junction as required, filling the holes with anti-termite chemical & sealing the holes with cement.If muddy channels are present
Read more
Raj Pest Control is an established Commercial Pest Control Company in Gurgaon. We have been consistently providing highly effective & trouble free pest control services.
Read more
We have earned very good reputation in the market for providing highest standards of residential pest control services in Delhi Ncr.
Read more